The sub floor is quite sloped from one slide of the extension to the other.
Floor screed perimeter insulation.
7 step 6 install the expansion foam.
2 step 1 preparation.
Edge insulation can be laid against all walls which stops the screed bridging the gap between the edge of the wall and the floor insulation.
Basically it stops the heat from seeping out of the edges of the floor where the screed concrete meets the wall.
Both are quite expensive and are likely to cost 500 to bring the lower side up to match.
The celotex fi5000 us4025 double act combines to offer a new approach to insulating solid floors by eliminating the need for an additional separating layer prior to screeding or concreting on top of the insulation.
4 step 3 laying down the floor insulation boards.
Install at full depth a 25mm thick perimeter strip of the same floor insulation along all external walls.
Before beginning the installation of the rigid insulation see to it that any services that are contained in the insulation are routed or cut on either side and sanded as.
Perimeter upstand insulation performs a vital function in the thermal envelope of the building.
Ensure top of perimeter strip is level with top of floor finish.
Bs en 1264 provides guidance on the design and sizing of the system.
The egde insulation is placed around the perimeter of the room heated area.
It s used to prevent cold bridging at the edge of the floor where it meets the wall.
Buider apologised and said just get more insulation or screed to level this out so obviously finished floor level is flat.
The edge insulation should be at least 25mm thick and height should extend from the top of the concrete slab to the top of the finished floor screed.
Lay a thin gauge polythene sheet to act as a separating layer over the insulation with 150mm lap joints.
Place xtratherm perimeter strips xt str around floor perimeter to provide robust detailing in order to reduce thermal bridging.
Once in place the final screed concrete is then applied.
The insulation is then laid followed by a polythene separating layer and either a concrete screed or tongue and groove chipboard ready to receive the specified floor finish.
Install a strip of edge insulation quinn therm qf insulation around the perimeter of the room against each wall to reduce heat loss through thermal bridging.
This is a vitally important step as it helps prevent cold bridging.
Lightweight rigid polyisocyanurate pir foam insulation boards such.
Celotex us4025 is used as the vertical perimeter upstand insulation when celotex fi5000 is used on the main floor area.
Where insulation is positioned above the slab the slab and dpm can be installed either way round.
3 step 2 priming solid floors skip to step 3 for timber floors.
6 step 5 lay the membrane for liquid screeds skip to step 6 if using a traditional screed mix.
Seal around any service penetrations.
The spacing of the pipework should be even but locally may be reduced around the external perimeter of rooms to compensate for the additional heat loss that occurs here.
Contents click a link to skip to the section you want to read.
It ranges from 150mm on one end to 250mm on the other.