It acknowledges that floor levels could be the same as threshold levels.
Floor levels nz.
Precision solutions specialises in foundation floor re levelling with extensive experience and an understanding of the christchurch canterbury landscape.
Figure 14 threshold levels relative to decks addresses threshold levels rather than floor levels as being critical for weathertightness.
Our reports focus on the key issues in the form of a summary.
Approximate minimum maximum and average ground level for properties requiring minimum floor levels under the building code and or christchurch district plan.
Slope no more than 1 200.
All personnel on our work sites carry sitesafe passports.
Review of survey practices in relation to the canterbury rebuild pdf 754 kb archive.
Branz level to within 5 mm within a single room or space.
Your future insurance and finance both rely on quality information being available at the time of purchase and resale.
It can also bring serious building code compliance problems and potential drainage problems due to an insufficient height of the floor above ground and lack of fall to the drains.
10 mm in total for lengths over 10 m.
Reference material for measuring floor levels following canterbury earthquakes.
Don t accept substandard reports.
Flooring individual sheets or boards.
Smartlift is proudly iso 9001 certified for commercial and residential foundation and floor levelling a grading that is recognised in more than 150 countries.
Risknet floor levels surveys are to nzis standards and are vital for all property in a postquake market.
There is no specific requirement in e2 as1 for a level change between the building finished floor level and the garage floor level.
Floor levels versus threshold levels.
Smartlift expertly levels and repairs foundations in commercial and residential buildings specialising in earthquake damaged properties in christchurch and canterbury.
Interim floor level requirements for a residential dwellings.
Predicted water levels in the 1 in 50 and 200 year design events including climate change and sea level rise allowances.
Where building and garage floor levels remain the same the comment to paragraph 9 1 3 4 gives three methods for achieving the respective step downs at the garage door threshold and adjacent cladding.
Floor levels getting the floor level wrong can lead to on going moisture problems.
Ph 0800 775 3835 email info precisionsolutions nz.
Mbie 5 mm maximum deviation in any 10 m length.